I
have now finished my project and when I look back at the
past two weeks doing this project I feel happy with how hard I worked
on this project and feel pleased with the final project. I
completed each project one by one which allowed me to do all my projects
in order, I always checked my ghantt chart so I knew how long I had for
each pat of the project. I have learned that when I try I can follow
deadlines which I have set for myself which will
be immensely important for my future on this course and in my future
in games design itself.
Everything that
I needed to do have been done to a good standard,
I wouldn't say it is perfect because I believe that I can always
improve. I have not been able to do the work at home which has been a slight
problem when trying to do the work but I have made up of that at college
when spending my dinner and breaks doing the work. I would have loved
to have been able to the art work at home but alas it was quite impossible,
after figuring this out I decided to do all the written work at home and all
the artwork at college so I would have a lot more time to do my work.
despite
the obvious set back of not being able do artwork at home I still tried
my hardest to finish all of the project, b doing this I do believe that I have
proven that I can manage my work time very effectively, I did this by
predicting how long each task would take and sticking to my predictions. The
final project was completed to satisfactory standards by using all techniques
that I have learned in lesson.
I
have never really done a large project like this in such a small amount of
time, I know I will definitely have to do projects like this in the future whether
they be college work or professional work, I’m happy to have done the work
because it has given me more confidence with what I will be doing in the
future.
No comments:
Post a Comment